Two phase addition and remodeling project, including the new ED, two new OR’s, new ICU and Radiology department. Also includes new dryvit applied to entire existing facility, a new chiller and heliport. The structural system was all pre-cast including pre-cast exterior walls. The HVAC system is a boiler/chiller VAV system.